CHULÉZINHO FCP - Vienna

Regular price €11,00
Sale price €11,00 Regular price €11,00
Save 0
Tax included.
powered by
% CO2e
Below category's global average

Product Life Cycle Analysis

0%
Raw Materials Extraction and processing of raw materials (agriculture, mining, logging) create environmental impacts before manufacturing begins.
0%
Manufacturing Production consumes energy, water, and other raw materials, resulting in emissions and natural resource depletion.
0%
Packaging Packaging materials such as plastic, paper and metal are used to accommodate and transport the product, contributing for their carbon footprint.
0%
Distribution The transportation of goods generates greenhouse gas emissions, influenced by transport type, distance, and logistics.
0%
Use Phase & End of Life Product usage may consume energy and resources through a certain lifespan, while its disposal may result in landfilling, incineration and recycling, releasing greenhouse gases.
A product life cycle analysis (LCA), in terms of carbon footprint, assesses the total greenhouse gas emissions generated at each stage of a product’s life, from raw material extraction to production, distribution, use, and disposal.

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
Product description

Now for the little ones!

FC Porto's strength lies in its fans. Show that you're Blue and White from head to toe with these socks!

Produced with seamless technology to obtain a sock with no seams on the toecap

The images shown are digital representations of the product. The final product may have small differences.

Composition: 

80% Organic cotton | 17% Polyamide | 3% Elastane

Made in Portugal

Care:

Wash the sock inside out at a temperature not exceeding 40ºC (140ºF). Do not dry, dry clean or iron.

Shipping & Return

Shipping cost is based on weight. Just add products to your cart and use the Shipping Calculator to see the shipping price.

We want you to be 100% satisfied with your purchase. Items can be returned or exchanged within 30 days of delivery.